230kV Daylight Transmission Line

  • Year2021

  • LocationMojave, CA

The 230kV Daylight underground Duct Bank and Transmission line were part of the overall Edwards Sanborn Solar and Energy Storage project in Mojave, CA.

CBI Power, Inc. scope of services included clear and grub of the site area, approximately 960 linear feet of 230kV Circuit Duct Bank and construction four (4) Duct Bank Riser Structures. To meet the project scheduling needs, CBI Power, utilized multiple crews, working 10hours per day, seven days per week.

The new transmission line connected to the Sunward switchyard, interconnecting with Southern California Edison’s grid.